Andover New Theatre

A major new venue for Andover

Client: Test Valley Borough Council
Location: Andover, Hampshire UK Status: Ongoing

BFF won a competitive tender for the redesign of the Andover New Theatre in July 2024. BFF have been working closely with Test Valley Borough Council and have recently unveiled plans for the new venue, which will be located in the heart of the town, providing capacity for up to 1000 people. We have been working alongside the rest of our design team to develop a design that retains the spirit of the existing Lights venue whilst providing a range of multipurpose modern facilities.

  • The need for a new theatre was first identified during the development of the Andover Masterplan, where more than 4,100 people contributed their thoughts about the future changes they wanted to see in the town. The results from this widespread public engagement showed that almost 80% of Andover residents highlighted a requirement for a new theatre in the town centre.

    Since then, the council has been working to get this project in motion and deliver on the community’s aspirations. Having been awarded £18.3m from the government to put towards the project, TVBC is now forging ahead to create a state-of the-art theatre, which will become the new home to The Lights.

    The main auditorium will provide 420 seats, an increase from the 249 available at the current theatre. The new venue will also feature a second event space which can be used flexibly to accommodate 120 seated to 350 standing, with retractable seating and a pop-up stage for music and comedy gigs and room for sit-down banquets.

    Local creative arts organisations will benefit from professional dance studios, situated on the first floor, featuring sprung floors and windows looking out across the High Street and Riverside Park. The second floor will house meeting rooms which can be hired out to the public. There will be two cafe/bars at either end of the building and external terraces for visitors to make use of in the warmer months.

    One of the striking differences between the new venue and The Lights will be the ability to run shows and events in both the auditorium and second event space simultaneously, as well as operating classes and meetings in other locations around the building. Quality sound proofing and an enhanced design will mean the venue can run at full occupancy.

“We set ourselves the task of creating a building that would house a first-class theatre for the town but also be a new landmark building for Andover, setting the standard for the rest of the town centre redevelopment. BFF have achieved both those things in spades, and they deserve our thanks and congratulations. The designs look great. Demolition should start soon. Construction swiftly after that. First curtain up in 2027! Bravo!”

— Kit Malthouse, MP for North West Hampshire

"We only get one shot at this and it’s my view we didn’t want to settle for an identikit theatre, we wanted to create a new public building that local people can be proud of for generations to come. The architects have done a fabulous job delivering on that aspiration by using high-quality materials and ensuring the specification fits the business plan.

With increased capacity, we have a real opportunity to bring so many more people into the town and support the local economy. These are very exciting times ahead and I can’t wait to see the designs come to life.”

— Phil North, Councillor for TVBC

Project Team

Lead Designer, Architect, Heritage Consultant & Principal Designer CDM & BSA: BFF Architects
Theatre & Acoustic Consultants: Charcoalblue
Civils & Structural Engineer: Integral Engineering
MEP Engineer: E3 Consulting
Project Manager & Cost Consultant: Ward Williams Associates
Landscape Architect: Studio Knight Stokoe Planning Consultant: The Planning Lab
Access Consultant: Keith Garner Access
Transport Consultant: MODE
Fire Consultant: OFR
Catering Consultant: Kendrick Hobbs

Related Projects